gtag('config', 'G-CC7S7H3KZE'); gtag('config', 'G-VL6XX2Y74C');
Wednesday, Feb. 11th 2026

Bellevue West High School Site Visit

This past week, Avant Acoustics performed final system commissioning and training at Bellevue West High School’s new performing arts building addition in Bellevue, NE.

Avant provided full AV system design services and recommendations for room acoustics in the auditorium, theater, lobby, and supporting spaces. The auditorium was designed to support a wide range of educational and performance needs for the school’s active music and performing arts programs.

Bellevue West’s Choir, Band, and Theater teachers (pictured here with our Senior Principal Bob Ledo) were happy to see the system go online and receive hands-on training on their new mixing console and custom control interfaces.

Andrew VonFeldt, PE was project manager for Avant, with support from Bob Ledo and David Wetzel. Avant was glad to have worked with Ralph Gladbach from GP Architecture and systems integrator Bizco Technologies on this project.

 

 

 


Posted in: General, Projects  |  Tagged with:

Comments are closed.

AVANT ACOUSTICS, LLC © All Rights Reserved. Privacy Policy